Hunan New Timehope Construction Machinery Co., Ltd.
Home Products Selling Leads Buying Leads About Us
 
Hunan New Timehope Construction Machinery Co., Ltd.

NO.6 Dazhong West Road, Jiuhua Economic Zone ,XiangtanCity,Hunan Province.China (Mainland)

411202

86-0731-52825569

86-0731-52825888



 
∷Products Instruction

Hunan New Timehope JBY62 Hydraulic Foot-Step Piling Rig

Hunan New Timehope JBY62 Hydraulic Foot-Step Piling Rig
Quantity:  1
Packaging:  C4
Effective Period:  180
  Company Info
  Date Joined: 2005
  Country/Territory: China (Mainland)
  Business Type: Manufacturer
  Number of Employees: 51 - 100 People
 
Detailed Product Description
JBY62 Hydraulic Foot-Step Piling Rig

Product General:
• JBY series Foot-step Multi-functional Pile Rig could work with diesel hammer, hydraulic driving hammar, and long screw drill etc. It adapts to various technics of foundation piling, and it is perfect upgrade product.
• Adopting of centralized electro-hydraulic controlling system, hydraulic foot-step chassis, hydraulic cylinder lifting, moving mechanism and rotary platform, moving quickly and agilely.
• Logical structure, advance technology, smooth operation, elegant appearance, high ratio of performance and price.
• Easy assembly & disassembly, quick & low-cost transportation.
• High adaptive faculty to construction ground with low intensity of pressure, quick pile connection, easy operation, safe & reliable, saving labour force, high efficiency.

Product Features:
Compared with traditional piling rig, such as rolling tube type, this machine has the characristics of logical structure, advanced technology, smooth operation, elegant appearance, and cost effiective, etc.

Easily assemble and disassembale. The pillar can be rised and fell by itselft. The host machine can be assembled and disassembaled by the chasis, no need of the cooperation of large tonnage crane. Adopting of centralized electro-hydraulic controlling system, hydraulic foot-step chasis, hydraulic cylinder lifting, moving mechanism and rotary platform, moving quickly and agilely. With much ground contact area and low intensity of pressure of the long boat and short boat. High adaptive faculty to construction site, quick pile connection, easy operation, greatly shorten the construction auxiliary operation time. Reducing the labor intensity of workers, saving labor about 3 to 4 person per shift. Working efficiency is twice than the traditional piling rig.
Send a message directly to this member
sonhoo corporation
 
∷Other Products
 
∷Related Other Products more.
 
 
 Want your products here?